Foundation reinforcement construction equipment based on frozen earth section and construction method thereof

The invention relates to the technical field of foundation reinforcement construction, in particular to foundation reinforcement construction equipment based on a frozen earth section and a construction method thereof, and the foundation reinforcement construction equipment comprises a fixing frame,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU QIANLAI, ZHAO PENGFEI, DONG HONGMING, YANG YULONG, LIU BO, KOH, SANG SHIN, LUAN XIAO'AO, LIU ZHONGXI, ZHANG YINGCHAO, LI GUANGDONG, ZHANG FEIFEI, ZHANG JINLEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the technical field of foundation reinforcement construction, in particular to foundation reinforcement construction equipment based on a frozen earth section and a construction method thereof, and the foundation reinforcement construction equipment comprises a fixing frame, a positioning and fixing mechanism and an abutting and pushing correction mechanism. According to the foundation reinforcing construction equipment based on the frozen earth section, before the two anchor rod piles are sleeved with the reinforcing plate, the reinforcing plate is adjusted, positioned, borne and fixed through cooperation of the positioning inserting columns and the positioning and fixing mechanisms, and then the two anchor rod piles are accurately sleeved with the reinforcing plate; then, through cooperation of a positioning insertion column and an abutting and pushing correction mechanism, perpendicularity correction of the anchor rod piles is achieved through the dual correction cooperation effect