Steel box girder mid-span continuous section ultra-long span integral lifting construction method
A super-long span integral lifting construction method for a midspan continuous section of a steel box girder comprises the construction steps that firstly, segment division design is carried out on a full-bridge steel box girder, the length of a steel box girder segment of the midspan integral lift...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A super-long span integral lifting construction method for a midspan continuous section of a steel box girder comprises the construction steps that firstly, segment division design is carried out on a full-bridge steel box girder, the length of a steel box girder segment of the midspan integral lifting section is smaller than the designed span length of a midspan, and a structure that a girder body of two side spans is in a cantilever structure from the pier top to the midspan is formed; 2, through accurate simulation calculation, deformation and stress influences are eliminated; thirdly, side span temporary supports are installed, and side span beam bodies are hoisted; fourthly, a pier top cantilever section lifting device is installed; step 5, arranging a pedestal and assembling a steel box girder; sixthly, the pier top cantilever section lifting device is connected with the lifting point anchoring structure; seventhly, hoisting is conducted after a lifting system is debugged; 8, after lifting in place, clo |
---|