Multi-partition power grid power mutual aid collaborative optimization operation method based on back-to-back converter
The invention discloses a multi-partition power grid power mutual aid collaborative optimization operation method based on a back-to-back converter, and the method comprises the steps: (1) constructing a distributed robust optimization framework, in the framework, decomposing the scheduling problem...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a multi-partition power grid power mutual aid collaborative optimization operation method based on a back-to-back converter, and the method comprises the steps: (1) constructing a distributed robust optimization framework, in the framework, decomposing the scheduling problem of a back-to-back flexible AC/DC interconnection system through employing an analysis target cascade ATC technology, and obtaining a distributed robust optimization model; the problem is decomposed into a main problem of an upper-layer control center and a sub-problem of a lower-layer control area; (2) determining an objective function and a constraint condition of an upper layer main problem; (3) determining an objective function and a constraint condition of a lower-layer sub-problem; and (4) solving an upper-layer main problem and a lower-layer sub-problem in the distributed robust optimization framework by adopting an IAIC algorithm, and determining a line power transmission plan and a scheduling strategy of ea |
---|