Coiled tubing push type perforation and bridge plug combined operation system and method

The invention relates to a coiled tubing push type perforation and bridge plug combined operation system. The problems that cost is high, time and labor are wasted and efficiency is low due to two-time perforation dragging construction of an existing oil and gas well are mainly solved. The device is...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FANG MING, WANG HONGFEI, YU BO, CAI SHAN, MIAO JIUCHANG, WANG JIUZHOU, YU HAI, TANG KE, FU CHENGUANG, WU JINMING, WANG SHUSHEN, LI ZHIXIN, LV WENFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a coiled tubing push type perforation and bridge plug combined operation system. The problems that cost is high, time and labor are wasted and efficiency is low due to two-time perforation dragging construction of an existing oil and gas well are mainly solved. The device is characterized in that the continuous oil pipe is connected with a ball-throwing, hole-opening and detonating device and a plurality of stages of time-delay perforation units; the last stage of delay explosion propagation device is connected with a bridge plug ignition device and a bridge plug tool; the using method comprises the steps that the pipe string combining perforation and bridge plug setting is constructed, the topmost-stage ball-throwing hole-opening detonation device is detonated through well mouth pressurization, perforation of the topmost-stage reservoir stratum is completed through the topmost-stage perforating gun, then the detonation time of the next-stage perforating gun is delayed through the del