Comprehensive mechanized longwall mining frame rear filling entry retaining method

The invention discloses a comprehensive mechanized longwall mining frame rear filling entry retaining method which comprises the following steps: step 1, planning a mechanized longwall mining frame rear filling working face on one side of an air return main roadway and a transportation main roadway,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIA LEI, ZHOU JING, YU BAONING, LIU LANG, JIA QIFENG, ZHANG ZEWU, HUAN CHAO, ZHANG BUQIN, LIU ZHIZHEN, ZHAO KANG, HE WEI, ZHUANG DENGDENG, LI YIMING, WANG RUOFAN, ZHU MENGBO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a comprehensive mechanized longwall mining frame rear filling entry retaining method which comprises the following steps: step 1, planning a mechanized longwall mining frame rear filling working face on one side of an air return main roadway and a transportation main roadway, and planning the length of the working face and the width of a gate road; secondly, an air return crossheading is tunneled in one side of the working face; thirdly, a coal mining machine, a scraper conveyor and a paste filling hydraulic support are adopted for mining the working face coal seam, and the roadway to be reserved is mined synchronously; fourthly, a filling pipeline is arranged in a reserved air return crossheading on the right side of the mined working face; fifthly, the paste filling hydraulic supports, the isolation supports and the prefabricated blocks are adopted to isolate the goaf formed behind the supports; and sixthly, filling slurry is connected into the filling operation area through a fillin