Comprehensive mechanized longwall mining frame rear filling entry retaining method
The invention discloses a comprehensive mechanized longwall mining frame rear filling entry retaining method which comprises the following steps: step 1, planning a mechanized longwall mining frame rear filling working face on one side of an air return main roadway and a transportation main roadway,...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a comprehensive mechanized longwall mining frame rear filling entry retaining method which comprises the following steps: step 1, planning a mechanized longwall mining frame rear filling working face on one side of an air return main roadway and a transportation main roadway, and planning the length of the working face and the width of a gate road; secondly, an air return crossheading is tunneled in one side of the working face; thirdly, a coal mining machine, a scraper conveyor and a paste filling hydraulic support are adopted for mining the working face coal seam, and the roadway to be reserved is mined synchronously; fourthly, a filling pipeline is arranged in a reserved air return crossheading on the right side of the mined working face; fifthly, the paste filling hydraulic supports, the isolation supports and the prefabricated blocks are adopted to isolate the goaf formed behind the supports; and sixthly, filling slurry is connected into the filling operation area through a fillin |
---|