Park integrated energy system optimization operation method and equipment considering energy supply reliability
The invention relates to a park integrated energy system optimization operation method and device considering energy supply reliability. The method comprises the following steps: obtaining basic data and economic and technical parameters of each device in a park integrated energy system PIES; establ...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a park integrated energy system optimization operation method and device considering energy supply reliability. The method comprises the following steps: obtaining basic data and economic and technical parameters of each device in a park integrated energy system PIES; establishing a mathematical model of each device in the park integrated energy system based on the basic data; a PIES optimization scheduling model considering energy supply reliability is constructed based on the mathematical model, and in the PIES optimization scheduling model, a spinning reserve constraint is modeled into a probability-form opportunity constraint; and based on the economic and technical parameters, a Cplex solver is adopted to solve the PIES optimization scheduling model, and an optimized IES optimal scheduling scheme is obtained. Compared with the prior art, the method has the advantages of realizing balance of PIES operation economy and reliability and the like.
本发明涉及一种考虑供能可靠性的园区综合能源系统优化运行方法及设备,所述方法 |
---|