Method for constructing budget calculation model of 5E daily repair project

The invention provides a 5E daily repair project budget calculation model construction method, and relates to the technical field of 5E repair project calculation. The 5E daily repair project budget calculation model construction method comprises the steps of judging whether a predicted object has i...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG WUJIE, CHEN JINSHENG, SUI HONG, LI PINLEI, LI GUO, ZHANG PAN, XU YAN, WU XUJING, JOO HYO-MOON, QIU ZHITAO, HUANG WEIJIA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a 5E daily repair project budget calculation model construction method, and relates to the technical field of 5E repair project calculation. The 5E daily repair project budget calculation model construction method comprises the steps of judging whether a predicted object has importance deviation or not, judging whether the predicted object needs to consider relative aging or not, judging the effective number of the predicted object, judging reasonable annual investment of unit equipment and making prediction. By constructing a 5E daily repair project budget calculation model, the asset life cycle management concept can be better implemented, the fine management work of the 5E repair project can be enhanced and standardized, meanwhile, power grid equipment and power production supporting facilities can be perfected well, the production cost is reasonably controlled, and the work efficiency is improved. And reasonable allocation and effective control of enterprise resources are realized t