Ultrahigh-pressure jet grouting pile auxiliary anti-seepage method for anti-seepage wall of earth and rockfill dam with deep covering layer
The invention discloses a deep covering layer high earth and rockfill dam anti-seepage wall ultrahigh pressure jet grouting pile auxiliary anti-seepage method, and belongs to the technical field of building construction. The method comprises the steps of foreground arrangement, background arrangemen...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a deep covering layer high earth and rockfill dam anti-seepage wall ultrahigh pressure jet grouting pile auxiliary anti-seepage method, and belongs to the technical field of building construction. The method comprises the steps of foreground arrangement, background arrangement and waste slurry sedimentation tank arrangement; determining the reinforcing position of the concrete diaphragm wall, measuring and setting out the reinforcing position, and numbering; guide hole construction; an ultrahigh-pressure jet grouting pile main machine is adopted for conducting ultrahigh-pressure jet grouting on formed holes, and reinforcing is conducted to form a single pile; and the ultrahigh-pressure jet grouting pile main machine is moved to the next pile position, and according to the reinforcing requirement of the anti-seepage wall of the earth and rockfill dam with the deep covering layer height, reinforcing of all the engaged row piles is completed. By arranging the ultrahigh-pressure jet grouti |
---|