Ground surface settlement-based displacement prediction method for underneath passing of existing shield tunnel by double-track tunnel
The invention discloses a ground surface settlement-based displacement prediction method for underneath passing of a double-track tunnel through an existing shield tunnel, and relates to the field of tunnel engineering. According to the ground surface settlement-based displacement prediction method...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a ground surface settlement-based displacement prediction method for underneath passing of a double-track tunnel through an existing shield tunnel, and relates to the field of tunnel engineering. According to the ground surface settlement-based displacement prediction method for underneath passing of the existing shield tunnel by the double-track tunnel, inversion is carried out according to a monitoring result of ground surface settlement induced by construction of a newly-built double-track tunnel, and a correlation coefficient reflecting characteristics of a ground surface settlement curve induced by construction of the newly-built double-track tunnel is obtained; the coefficient obtained through inversion is used for predicting deep soil settlement at the position of the existing tunnel; the existing shield tunnel is regarded as a continuous beam model on a foundation, and a balance differential equation about the vertical displacement of the existing shield tunnel is obtained; and |
---|