Method for improving recovery ratio of fractured bottom water gas reservoir through drainage of low part of horizontal well
The invention discloses a method for improving the recovery ratio of a fractured bottom water gas reservoir through drainage of a low part of a horizontal well, and the method comprises the following steps: S1, dividing a bottom water breakthrough area of a target fractured bottom water gas reservoi...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a method for improving the recovery ratio of a fractured bottom water gas reservoir through drainage of a low part of a horizontal well, and the method comprises the following steps: S1, dividing a bottom water breakthrough area of a target fractured bottom water gas reservoir, and delineating a favorable development area of the target fractured bottom water gas reservoir in the bottom water breakthrough area; s2, determining a high gas saturation horizon and a gas-water interface position of the target fractured bottom water gas reservoir; s3, acquiring actual production data of a target fractured bottom water gas reservoir, and determining a production vertical well in which the target fractured bottom water gas reservoir is completely flooded to stop production according to the actual production data; and S4, according to the favorable development area, the high-gas-saturation horizon and the gas-water interface position, a horizontal well is dug through a shaft of the production ve |
---|