Mobile energy storage two-stage scheduling method for improving toughness of power distribution network

The invention relates to a mobile energy storage two-stage scheduling method for improving the toughness of a power distribution network. The method comprises the following steps: establishing a weather model according to weather data of a place where the power distribution network is located; estab...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI HONGZHONG, YANG XIU, XIE PEIKUN, ZHANG ZHIQUAN, LI ZHENKUN, TIAN SHUXIN, CHAI WEI, DENG LIRONG, FU YANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a mobile energy storage two-stage scheduling method for improving the toughness of a power distribution network. The method comprises the following steps: establishing a weather model according to weather data of a place where the power distribution network is located; establishing a line fault rate model according to the fault rate of the power distribution network; generating a fault scene according to the weather model and the line fault rate model; establishing a traffic road network model according to the traffic route of the location of the power distribution network; establishing an MES scheduling model according to the MES scheduling position; and based on the damage probability of each point of the power distribution network in the fault scene, a route incidence matrix between each point of the power distribution network and the MES storage point is obtained according to the traffic network model, and a pre-disaster pre-scheduling scheme and a disaster real-time scheduling sc