High-altitude construction method for continuous and ultra-long high-altitude tile pressing

The invention is applicable to the technical field of building construction, and provides a high-altitude construction method for continuous and ultra-long high-altitude tile pressing, which comprises the following steps: after a main body structure is mounted, checking and accepting fastening bolts...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HE ZONGZHUO, DENG BAISHENG, LIANG JIANHANG, CHEN RUPEI, FENG JIAJIE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention is applicable to the technical field of building construction, and provides a high-altitude construction method for continuous and ultra-long high-altitude tile pressing, which comprises the following steps: after a main body structure is mounted, checking and accepting fastening bolts for connecting purlines with a roof beam and staggered joints and straightness of adjacent purlines; after the purline is accepted and accepted to be qualified, the installation direction of the high-altitude pressing tile is determined, a plurality of rail cars moving along the purline are arranged above the main body structure, and the rail cars are parallel and synchronous through connecting rods; the high-altitude pressed tiles are conveyed to a rail car, the rail car bears the high-altitude pressed tiles, and the high-altitude pressed tiles are transported on the roof through the rail car; according to the invention, the qualified purline is used as a track, the track car is arranged along the purline, the co