Lean management method for construction drawings of power transmission and transformation project

The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding dra...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LU QINXIN, YE LEI, HUANG JIAN, LIN BO, WU XINMENG, ZHAN SONGJIE, GONG ZHILAN, JIANG JINGYI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LU QINXIN
YE LEI
HUANG JIAN
LIN BO
WU XINMENG
ZHAN SONGJIE
GONG ZHILAN
JIANG JINGYI
description The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117670232A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117670232A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117670232A3</originalsourceid><addsrcrecordid>eNqNiz0KwkAQRtNYiHqH8QCCScDUEhQLsbIPw-5sTHBnlp2RXN_fA1g9-N735gWeCRkiMvYUiQ0i2U08BMnghNXyw9kgDD7jNHCvIAGSTJTBMrLGQfWtkf13eIURP0XKMpKzZTELeFda_bgo1sfDtT1tKElHmtARk3XtpSybXbOt6mpf__N5ApllPt4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Lean management method for construction drawings of power transmission and transformation project</title><source>esp@cenet</source><creator>LU QINXIN ; YE LEI ; HUANG JIAN ; LIN BO ; WU XINMENG ; ZHAN SONGJIE ; GONG ZHILAN ; JIANG JINGYI</creator><creatorcontrib>LU QINXIN ; YE LEI ; HUANG JIAN ; LIN BO ; WU XINMENG ; ZHAN SONGJIE ; GONG ZHILAN ; JIANG JINGYI</creatorcontrib><description>The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240308&amp;DB=EPODOC&amp;CC=CN&amp;NR=117670232A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240308&amp;DB=EPODOC&amp;CC=CN&amp;NR=117670232A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LU QINXIN</creatorcontrib><creatorcontrib>YE LEI</creatorcontrib><creatorcontrib>HUANG JIAN</creatorcontrib><creatorcontrib>LIN BO</creatorcontrib><creatorcontrib>WU XINMENG</creatorcontrib><creatorcontrib>ZHAN SONGJIE</creatorcontrib><creatorcontrib>GONG ZHILAN</creatorcontrib><creatorcontrib>JIANG JINGYI</creatorcontrib><title>Lean management method for construction drawings of power transmission and transformation project</title><description>The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNiz0KwkAQRtNYiHqH8QCCScDUEhQLsbIPw-5sTHBnlp2RXN_fA1g9-N735gWeCRkiMvYUiQ0i2U08BMnghNXyw9kgDD7jNHCvIAGSTJTBMrLGQfWtkf13eIURP0XKMpKzZTELeFda_bgo1sfDtT1tKElHmtARk3XtpSybXbOt6mpf__N5ApllPt4</recordid><startdate>20240308</startdate><enddate>20240308</enddate><creator>LU QINXIN</creator><creator>YE LEI</creator><creator>HUANG JIAN</creator><creator>LIN BO</creator><creator>WU XINMENG</creator><creator>ZHAN SONGJIE</creator><creator>GONG ZHILAN</creator><creator>JIANG JINGYI</creator><scope>EVB</scope></search><sort><creationdate>20240308</creationdate><title>Lean management method for construction drawings of power transmission and transformation project</title><author>LU QINXIN ; YE LEI ; HUANG JIAN ; LIN BO ; WU XINMENG ; ZHAN SONGJIE ; GONG ZHILAN ; JIANG JINGYI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117670232A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>LU QINXIN</creatorcontrib><creatorcontrib>YE LEI</creatorcontrib><creatorcontrib>HUANG JIAN</creatorcontrib><creatorcontrib>LIN BO</creatorcontrib><creatorcontrib>WU XINMENG</creatorcontrib><creatorcontrib>ZHAN SONGJIE</creatorcontrib><creatorcontrib>GONG ZHILAN</creatorcontrib><creatorcontrib>JIANG JINGYI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LU QINXIN</au><au>YE LEI</au><au>HUANG JIAN</au><au>LIN BO</au><au>WU XINMENG</au><au>ZHAN SONGJIE</au><au>GONG ZHILAN</au><au>JIANG JINGYI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Lean management method for construction drawings of power transmission and transformation project</title><date>2024-03-08</date><risdate>2024</risdate><abstract>The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117670232A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
ELECTRIC DIGITAL DATA PROCESSING
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Lean management method for construction drawings of power transmission and transformation project
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T07%3A17%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LU%20QINXIN&rft.date=2024-03-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117670232A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true