Lean management method for construction drawings of power transmission and transformation project
The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding dra...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LU QINXIN YE LEI HUANG JIAN LIN BO WU XINMENG ZHAN SONGJIE GONG ZHILAN JIANG JINGYI |
description | The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117670232A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117670232A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117670232A3</originalsourceid><addsrcrecordid>eNqNiz0KwkAQRtNYiHqH8QCCScDUEhQLsbIPw-5sTHBnlp2RXN_fA1g9-N735gWeCRkiMvYUiQ0i2U08BMnghNXyw9kgDD7jNHCvIAGSTJTBMrLGQfWtkf13eIURP0XKMpKzZTELeFda_bgo1sfDtT1tKElHmtARk3XtpSybXbOt6mpf__N5ApllPt4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Lean management method for construction drawings of power transmission and transformation project</title><source>esp@cenet</source><creator>LU QINXIN ; YE LEI ; HUANG JIAN ; LIN BO ; WU XINMENG ; ZHAN SONGJIE ; GONG ZHILAN ; JIANG JINGYI</creator><creatorcontrib>LU QINXIN ; YE LEI ; HUANG JIAN ; LIN BO ; WU XINMENG ; ZHAN SONGJIE ; GONG ZHILAN ; JIANG JINGYI</creatorcontrib><description>The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240308&DB=EPODOC&CC=CN&NR=117670232A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240308&DB=EPODOC&CC=CN&NR=117670232A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LU QINXIN</creatorcontrib><creatorcontrib>YE LEI</creatorcontrib><creatorcontrib>HUANG JIAN</creatorcontrib><creatorcontrib>LIN BO</creatorcontrib><creatorcontrib>WU XINMENG</creatorcontrib><creatorcontrib>ZHAN SONGJIE</creatorcontrib><creatorcontrib>GONG ZHILAN</creatorcontrib><creatorcontrib>JIANG JINGYI</creatorcontrib><title>Lean management method for construction drawings of power transmission and transformation project</title><description>The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNiz0KwkAQRtNYiHqH8QCCScDUEhQLsbIPw-5sTHBnlp2RXN_fA1g9-N735gWeCRkiMvYUiQ0i2U08BMnghNXyw9kgDD7jNHCvIAGSTJTBMrLGQfWtkf13eIURP0XKMpKzZTELeFda_bgo1sfDtT1tKElHmtARk3XtpSybXbOt6mpf__N5ApllPt4</recordid><startdate>20240308</startdate><enddate>20240308</enddate><creator>LU QINXIN</creator><creator>YE LEI</creator><creator>HUANG JIAN</creator><creator>LIN BO</creator><creator>WU XINMENG</creator><creator>ZHAN SONGJIE</creator><creator>GONG ZHILAN</creator><creator>JIANG JINGYI</creator><scope>EVB</scope></search><sort><creationdate>20240308</creationdate><title>Lean management method for construction drawings of power transmission and transformation project</title><author>LU QINXIN ; YE LEI ; HUANG JIAN ; LIN BO ; WU XINMENG ; ZHAN SONGJIE ; GONG ZHILAN ; JIANG JINGYI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117670232A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>LU QINXIN</creatorcontrib><creatorcontrib>YE LEI</creatorcontrib><creatorcontrib>HUANG JIAN</creatorcontrib><creatorcontrib>LIN BO</creatorcontrib><creatorcontrib>WU XINMENG</creatorcontrib><creatorcontrib>ZHAN SONGJIE</creatorcontrib><creatorcontrib>GONG ZHILAN</creatorcontrib><creatorcontrib>JIANG JINGYI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LU QINXIN</au><au>YE LEI</au><au>HUANG JIAN</au><au>LIN BO</au><au>WU XINMENG</au><au>ZHAN SONGJIE</au><au>GONG ZHILAN</au><au>JIANG JINGYI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Lean management method for construction drawings of power transmission and transformation project</title><date>2024-03-08</date><risdate>2024</risdate><abstract>The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117670232A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRIC DIGITAL DATA PROCESSING PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Lean management method for construction drawings of power transmission and transformation project |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T07%3A17%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LU%20QINXIN&rft.date=2024-03-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117670232A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |