Lean management method for construction drawings of power transmission and transformation project
The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding dra...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a power transmission and transformation project construction drawing lean management method, which comprises the following steps: S1, dividing a power transmission and transformation project into a power transformation project and a line project, collecting corresponding drawing data, and respectively establishing a power transformation project model and a line project model; s2, establishing a screening and scoring model of a parameterized transformer substation construction drawing "fixed module + selectable module"; s3, a construction drawing fixing module in the step S2 comprises a complete fixing module and a partial fixing module, the complete fixing module is a module which can completely determine a design scheme and can calculate the engineering quantity according to the construction drawing, and the partial fixing module is a module which can determine the design scheme but cannot completely determine the engineering quantity; and S4, the construction drawing selectable modu |
---|