Arch bridge steel truss composite beam double-ship floating method erection method
The invention relates to the technical field of bridge construction, and particularly discloses an arch bridge steel truss composite beam double-ship floating support method erection method which comprises the following steps: S1, floating support erection; s2, analyzing the stability of the floatin...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of bridge construction, and particularly discloses an arch bridge steel truss composite beam double-ship floating support method erection method which comprises the following steps: S1, floating support erection; s2, analyzing the stability of the floating support; s3, adjusting the height of the upper floating support; s4, walking and positioning the floating support; s5, mounting the steel truss composite beam; s6, adding water into the floating support, sinking and leaving; according to the method, the arch bridge steel truss composite beam can be effectively erected through the double-ship floating support, the method can adapt to the narrow construction environment, and compared with a cable crane hoisting method and a floating crane hoisting method, the method has the advantage that the navigation closing frequency is reduced.
本发明涉及桥梁施工技术领域,具体公开了一种拱桥钢桁组合梁双船浮托法架设方法,包括如下步骤:S1:浮托架设;S2:对浮托稳定性进行分析;S3:对浮托上支架高度调整;S4:对浮托行走及定位;S5:对钢桁组合梁安装;S6:浮托加水下沉离开;本发明通过双船浮托可以有效的对拱桥 |
---|