Regulation resource planning method and system considering risk prevention and control demand
The invention discloses an adjustment resource planning method and system considering a risk prevention and control demand, and relates to the technical field of power system planning, and the method comprises the steps: inputting the investment and operation cost parameters of built and to-be-plann...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an adjustment resource planning method and system considering a risk prevention and control demand, and relates to the technical field of power system planning, and the method comprises the steps: inputting the investment and operation cost parameters of built and to-be-planned distributed resources based on the new energy output and load historical data of a planning region; establishing constraint models of energy storage operation constraint, generator constraint, power distribution network power flow constraint and reactive power control characteristic related constraint of the photovoltaic grid-connected inverter; an optimization objective function with the minimum power generation cost of a generator, the minimum energy storage investment and replacement cost and the minimum investment and operation and maintenance cost of photovoltaic and charging piles is constructed; and constructing an adjustment resource planning model based on the constraint model and the optimization objec |
---|