Construction method of super-long bearing platform expansion joint
The invention discloses a construction method of a super-long bearing platform expansion joint. The construction method comprises the following steps that S1, surveying and lofting are conducted, specifically, a construction position and a size side line are obtained through surveying and lofting; s...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction method of a super-long bearing platform expansion joint. The construction method comprises the following steps that S1, surveying and lofting are conducted, specifically, a construction position and a size side line are obtained through surveying and lofting; s2, bottom waterproof construction is conducted, specifically, a formwork is installed, and sealant is poured; s3, a first-layer foam board is installed, specifically, the first-layer foam board is installed according to the expansion joint side line; s4, construction of a force transmission structure: mounting multiple layers of force transmission rods, and arranging a bracket; s5, a first-layer water stop belt is installed, specifically, the first-layer water stop belt is installed; s6, a second layer of foam board is installed, wherein the second layer of foam board is installed; s7, top waterproof construction is conducted, specifically, an angle steel assembly is arranged and sealed through sealant, and a secon |
---|