Blasting explosive unit consumption optimization method and system based on drilling machine operation parameters

The embodiment of the invention discloses a blasting explosive unit consumption optimization method and system based on drilling machine operation parameters, and relates to the technical field of engineering blasting. The problem that the blasting effect of blasting explosives on ore rocks is not i...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG RENSHU, TAN NAIGEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The embodiment of the invention discloses a blasting explosive unit consumption optimization method and system based on drilling machine operation parameters, and relates to the technical field of engineering blasting. The problem that the blasting effect of blasting explosives on ore rocks is not ideal is solved. The blasting explosive unit consumption optimization method based on the operation parameters of the drilling machine comprises the steps that the operation parameters of the drilling machine and drilling mark parameters in the drilling process are obtained, and the operation parameters of the drilling machine correspond to the drilling mark parameters at the same moment; performing inversion analysis on the operation parameters of the drilling machine based on a preset model to obtain mechanical parameters of rock mass around the drilled hole; and determining the charge unit consumption of the drill hole according to the mechanical parameters of the rock mass around the hole and the corresponding d