Method, device and equipment for determining accurate use amount of pavement adhesive layer
The invention relates to the field of road pavements, and discloses a method, a device and equipment for determining the accurate use amount of a pavement bonding layer, and the method comprises the following steps: obtaining a first optimal bonding layer use amount range of a bearing layer under di...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the field of road pavements, and discloses a method, a device and equipment for determining the accurate use amount of a pavement bonding layer, and the method comprises the following steps: obtaining a first optimal bonding layer use amount range of a bearing layer under different construction depths at a construction site; obtaining a second optimal bonding layer dosage range of the surface layer asphalt mixture for the upper layer of the construction site under different void ratios; taking an intersection of the first optimal adhesive layer dosage range and the second optimal adhesive layer dosage range as a final optimal adhesive layer dosage range; actual pavement parameters of the construction site are obtained, and the adhesive layer spreading amount is determined according to the actual pavement parameters and the final optimal adhesive layer using amount range. According to the method, the problems of uneven implementation quality, resource waste and the like caused by the f |
---|