Construction method for reinforcing obstacle pile to be broken in underground tunnel construction

The invention discloses a construction method for reinforcing a to-be-broken obstacle pile in underground tunnel construction. The construction method comprises the following steps that firstly, construction preparation is conducted; secondly, micro pile construction is conducted through hole formin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI WEIJUN, LIU LEI, ZHOU RENRONG, TANG XUYANG, YANG YONG, LIANG CUNJUN, REN ZETIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for reinforcing a to-be-broken obstacle pile in underground tunnel construction. The construction method comprises the following steps that firstly, construction preparation is conducted; secondly, micro pile construction is conducted through hole forming, reinforcement cage inserting, grouting and top beam construction; thirdly, a construction platform is erected; fourthly, an initial well is excavated and supported; 5, guide rail pouring and backrest supporting are conducted; sixthly, various construction devices are installed; seventhly, the existing obstacle pile to be broken and removed is reinforced through crossed pre-stressed anchor cable locking construction; 8, the obstacle piles are broken in a static crushing mode; and ninthly, jacking construction and monitoring are conducted. According to the method, the obstacle piles can be broken and effectively reinforced in the tunnel excavation process. 本发明公开了一种地下隧道施工加固拟破除障碍桩施工工法,该工法通过以下步骤实现:步骤一、进行施工准备;步骤二、通过成孔