Construction hanging basket operation risk real-time monitoring method and system

The invention relates to the technical field of data processing, in particular to a construction hanging basket operation risk real-time monitoring method and system.The method comprises the steps that historical inclination time sequence data of a construction hanging basket in the operation proces...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LUO GUANGZONG, DU ZHAOLEI, YANG MINGBO, REN WENCHAO, ZHAO XIANG, DOU YULIANG, LIANG HAIBIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the technical field of data processing, in particular to a construction hanging basket operation risk real-time monitoring method and system.The method comprises the steps that historical inclination time sequence data of a construction hanging basket in the operation process is obtained, and normalization processing is conducted on the historical inclination time sequence data; the obtained normalized historical gradient time series data are used as target time series data; acquiring marked data points in the target time sequence data; classifying the marked data points to obtain corresponding classification results; obtaining an ACF correlation coefficient graph of the target time series data, and obtaining a lag order of each data point in the target time series data according to the ACF correlation coefficient graph and the classification result; according to the method, the optimal ARMA model is fitted according to the lag order of each data point in the target time sequence data