One-time forming construction method for medium-length hole cable-stayed groove
The invention relates to the technical field of medium-length hole mining of over medium-thickness ore bodies of underground metal mines, in particular to a medium-length hole cable-stayed groove one-time forming construction method which comprises the following steps that S1, compensation spaces ar...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of medium-length hole mining of over medium-thickness ore bodies of underground metal mines, in particular to a medium-length hole cable-stayed groove one-time forming construction method which comprises the following steps that S1, compensation spaces are constructed on the upper portion and the lower portion of a to-be-constructed cutting groove area of an ore body correspondingly, the compensation space constructed on the upper portion is a first compensation space, and the compensation space constructed on the lower portion is a second compensation space; the compensation space of the lower construction is a second compensation space, and a cutting area is formed between the first compensation space and the second compensation space; s2, the whole cutting area is divided into a cutting well area A, a well expanding area B and a groove broaching area C, and a cutting well compensation large hole in the cutting well area is constructed; s3, normal blast holes are |
---|