Construction method for positioning and installing large aircraft high-speed test sliding rail

The invention discloses a construction method for positioning and mounting a large aircraft high-speed test sliding rail. The construction method comprises the following steps: S1, surveying and setting out: surveying and setting out a grouting range; s2, brushing an interface agent: brushing the in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YIN QIJIA, CHEN JINGRU, LIU JIAN, ZHANG NING, LUO LIHONG, LUO BIN, WU YINGYE, WU YANBIN, DENG ZHENGWEN, WANG LEI, HU CHENG, LYU MAOFENG, FU YE, YAO YUANSHUI, HE SASA, XU WEN, ZHU JIEBING, HE WEI, HUANG WEN, XING HAO, XU YI, LIU ZHOU, LI DONGHAI, ZHOU WEIKANG, ZHANG SHUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for positioning and mounting a large aircraft high-speed test sliding rail. The construction method comprises the following steps: S1, surveying and setting out: surveying and setting out a grouting range; s2, brushing an interface agent: brushing the interface agent on the concrete surface after the grouting range is roughened; s3, measuring and lofting: measuring and lofting a slide rail starting point mileage control point, a center line control point and an elevation; s4, anchoring part assembling is conducted, specifically, a screw rod and a pre-embedded plate are assembled and placed in a pre-embedded sleeve, and then a supporting plate is installed; s5, sliding rail hoisting, wherein a supporting frame is arranged, and a sliding rail is hoisted; s6, the sliding rail is initially adjusted, specifically, the sliding rail is initially adjusted according to the center line control point and the elevation of the sliding rail; s7, fine adjustment of the sliding r