Construction paying-off operation and measurement method based on unified error deviation construction strategy
The invention discloses a construction paying-off operation and measurement method based on a unified error deviation construction strategy, and the method comprises the steps: determining a pre-deviation first layer of a super high-rise eccentric cylinder structure based on an initial pre-arching t...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction paying-off operation and measurement method based on a unified error deviation construction strategy, and the method comprises the steps: determining a pre-deviation first layer of a super high-rise eccentric cylinder structure based on an initial pre-arching target curve; under the condition that the axis is not changed, the position of a wall positioning line of a floor within a preset floor number range is adjusted layer by layer from the first deviation correction floor upwards, and the wall of the floor inclines towards the eccentric direction to be pre-deviated by a unified error to be deviated for construction; after floor construction in a preset floor number range, the plane position variation of the deviation correction tail floor in the preset floor number range is monitored; and adjusting the initial pre-arching target curve to obtain a corrected pre-arching target curve based on the plane position variable quantity of the deviation correction tail layer in a |
---|