Travelling crane sliding construction method for roof grid steel structure in large garbage pool
The invention relates to the field of on-site preparation, carrying or processing of building materials or building components, in particular to a crane sliding construction method for a roof grid steel structure in a large garbage pool. The invention relates to a driving sliding construction method...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the field of on-site preparation, carrying or processing of building materials or building components, in particular to a crane sliding construction method for a roof grid steel structure in a large garbage pool. The invention relates to a driving sliding construction method for a roof grid steel structure in a large garbage pool. The driving sliding construction method is characterized by comprising the following steps of: 1, segmenting; 2, the support is assembled; 3, erecting a stand column; step 4, hoisting; step 5, traction; step 6, fixing; and step 7, repeating. The installation precision is high, and the construction efficiency is high.
本发明涉及建筑材料或建筑构件在现场的制备、搬运或加工领域,具体为一种大型垃圾池内屋面网架钢结构行车滑移施工方法。一种大型垃圾池内屋面网架钢结构行车滑移施工方法,其特征是:按如下步骤依次实施:步骤1、分段;步骤2、组装支架;步骤3、搭设立柱;步骤4、吊装;步骤5、牵引;步骤6、固定;步骤7、反复。本发明安装精度高,施工效率快。 |
---|