Park integrated energy system master-slave game optimization scheduling method considering dual incentive mechanism
A park integrated energy system master-slave game optimization scheduling method considering a dual incentive mechanism comprises the following steps that 1, a park integrated energy system model is established, and the park integrated energy system model mainly comprises a gas turbine model, a wast...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A park integrated energy system master-slave game optimization scheduling method considering a dual incentive mechanism comprises the following steps that 1, a park integrated energy system model is established, and the park integrated energy system model mainly comprises a gas turbine model, a waste heat boiler model, a gas boiler model, an electric energy storage model and a heat energy storage model; 2, building a park integrated energy system master-slave game framework of a dual incentive mechanism considering dynamic stepped carbon transaction and dynamic stepped demand response by using the model built in the step 1; firstly, a park comprehensive energy system model is established; a master-slave game framework of a dual-incentive mechanism comprehensively considering dynamic stepped carbon transaction and dynamic stepped demand response is proposed for the first time on the basis of the model structure; establishing a dual-main-body master-slave game optimization scheduling model by taking benefit max |
---|