Tunnel blasting construction over-break and under-break optimization method
The invention relates to the field of tunnel construction, and particularly discloses a tunnel blasting construction over-break and under-break optimization method which comprises the following steps: S1, selecting an initial blasting parameter set; s2, rock mass areas are divided, and rock mass qua...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the field of tunnel construction, and particularly discloses a tunnel blasting construction over-break and under-break optimization method which comprises the following steps: S1, selecting an initial blasting parameter set; s2, rock mass areas are divided, and rock mass quality evaluation parameters of all the rock mass areas are obtained; s3, a mapping relation model of input parameters and output parameters is built, the input parameters are rock mass quality evaluation parameters and initial blasting parameters, and the output parameters comprise over-excavation and under-excavation area parameters, blast hole utilization rates, vault sinking parameters and dimension stone size parameters; s4, training the mapping relation model based on input parameters until the mapping relation model is stable; and S5, based on the smooth blasting parameter range table, using an optimization algorithm to obtain and output optimal smooth blasting parameters. The method has the advantages that th |
---|