Coal mine tunnel floor heave treatment method

The embodiment of the invention discloses a coal mine roadway floor heave treatment method which can effectively solve the problem of roadway floor heave. Comprising the steps that a drilling machine drills a hole downwards in a mine roadway bottom plate through a twist drill rod; an orifice pipe is...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI JIANGFENG, LIU JIAN, CHEN JIN, GUO CHAO, WANG DONGPING, GUO DONGMING, XIAO BOFENG, KONG WEIGANG, HAO ZHENXIANG, WANG JIAN, WANG HENGKAI, HOU XUBIN, LIU YIFEI, LIU JIAHUA, ZHAO LEI, ZHANG WEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The embodiment of the invention discloses a coal mine roadway floor heave treatment method which can effectively solve the problem of roadway floor heave. Comprising the steps that a drilling machine drills a hole downwards in a mine roadway bottom plate through a twist drill rod; an orifice pipe is installed at an orifice of the drill hole, the orifice pipe is provided with a 7-shaped flow guide pipe, and the orifice pipe goes deep into the drill hole by a preset distance; replacing a twist drill rod with a stirring drill rod, wherein a drill bit at the end part of the stirring drill rod is a crushing drill bit; a deslagging slurry pump and a high-pressure gas pipeline are connected through a three-way valve, deslagging slurry is guided into the drill hole through an outlet of the three-way valve, and the 7-shaped flow guide pipe is communicated to a sedimentation tank; a deslagging slurry pump is opened, the gas-liquid proportion is adjusted through a three-way valve, and bubbles are formed in the drill hol