High-altitude integral hoisting construction method for special-shaped steel member
The invention belongs to the technical field of building construction structures. The high-altitude integral hoisting construction method for the special-shaped steel member comprises the following steps: mounting the pre-embedded assembly; mounting the hoisting device; the special-shaped steel comp...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention belongs to the technical field of building construction structures. The high-altitude integral hoisting construction method for the special-shaped steel member comprises the following steps: mounting the pre-embedded assembly; mounting the hoisting device; the special-shaped steel components are spliced; lifting the special-shaped steel member; rotating the special-shaped steel member; and transferring the special-shaped steel member. The method is used for solving the technical problem that continuous operation such as lifting, positioning, rotating and in-place is difficult to complete at a time by an existing lifting method.
本发明属于建筑施工结构技术领域。异形钢构件高空整体吊装施工方法,包括:预埋组件的安装;吊装装置的安装;异形钢构件的拼装;异形钢构件的提升;异形钢构件的旋转;异形钢构件的移送。本发明用以解决现有吊装方法很难一次完成提升、定位、旋转、就位等连续作业的技术问题。 |
---|