Building deviation rectifying method

The invention relates to the technical field of building deviation rectification, in particular to a building deviation rectification method which comprises the following construction steps of excavation of a foundation pit, implantation of a reinforcing pile, installation of a monitoring system, im...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN QIANRAN, TIAN PEIXIAN, ZHOU JINWEN, LIN QIHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN QIANRAN
TIAN PEIXIAN
ZHOU JINWEN
LIN QIHUI
description The invention relates to the technical field of building deviation rectification, in particular to a building deviation rectification method which comprises the following construction steps of excavation of a foundation pit, implantation of a reinforcing pile, installation of a monitoring system, implantation of a steel pipe set, flushing deviation rectification, installation of a reinforcement cage and first foundation maintenance. And the deviation rectifying procedure of the building can be simplified. 本申请涉及建筑物纠偏的技术领域,尤其是涉及一种建筑物纠偏方法,包括如下施工步骤:开挖基础坑、植入加固桩、安装监控系统、植入钢管组、冲水纠偏、加装钢筋笼、第一地基养护,可以减少纠偏过程中对建筑物原结构损伤情况,能够简化建筑物的纠偏工序。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117107835A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117107835A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117107835A3</originalsourceid><addsrcrecordid>eNrjZFBxKs3MScnMS1dISS3LTCzJzM9TKEpNLslMqwQJ5qaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0NzQwNzC2NTR2Ni1AAALU0nEw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Building deviation rectifying method</title><source>esp@cenet</source><creator>CHEN QIANRAN ; TIAN PEIXIAN ; ZHOU JINWEN ; LIN QIHUI</creator><creatorcontrib>CHEN QIANRAN ; TIAN PEIXIAN ; ZHOU JINWEN ; LIN QIHUI</creatorcontrib><description>The invention relates to the technical field of building deviation rectification, in particular to a building deviation rectification method which comprises the following construction steps of excavation of a foundation pit, implantation of a reinforcing pile, installation of a monitoring system, implantation of a steel pipe set, flushing deviation rectification, installation of a reinforcement cage and first foundation maintenance. And the deviation rectifying procedure of the building can be simplified. 本申请涉及建筑物纠偏的技术领域,尤其是涉及一种建筑物纠偏方法,包括如下施工步骤:开挖基础坑、植入加固桩、安装监控系统、植入钢管组、冲水纠偏、加装钢筋笼、第一地基养护,可以减少纠偏过程中对建筑物原结构损伤情况,能够简化建筑物的纠偏工序。</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GYROSCOPIC INSTRUMENTS ; HYDRAULIC ENGINEERING ; MEASURING ; MEASURING DISTANCES, LEVELS OR BEARINGS ; NAVIGATION ; PHOTOGRAMMETRY OR VIDEOGRAMMETRY ; PHYSICS ; SOIL SHIFTING ; SURVEYING ; TESTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231124&amp;DB=EPODOC&amp;CC=CN&amp;NR=117107835A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25555,76308</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231124&amp;DB=EPODOC&amp;CC=CN&amp;NR=117107835A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN QIANRAN</creatorcontrib><creatorcontrib>TIAN PEIXIAN</creatorcontrib><creatorcontrib>ZHOU JINWEN</creatorcontrib><creatorcontrib>LIN QIHUI</creatorcontrib><title>Building deviation rectifying method</title><description>The invention relates to the technical field of building deviation rectification, in particular to a building deviation rectification method which comprises the following construction steps of excavation of a foundation pit, implantation of a reinforcing pile, installation of a monitoring system, implantation of a steel pipe set, flushing deviation rectification, installation of a reinforcement cage and first foundation maintenance. And the deviation rectifying procedure of the building can be simplified. 本申请涉及建筑物纠偏的技术领域,尤其是涉及一种建筑物纠偏方法,包括如下施工步骤:开挖基础坑、植入加固桩、安装监控系统、植入钢管组、冲水纠偏、加装钢筋笼、第一地基养护,可以减少纠偏过程中对建筑物原结构损伤情况,能够简化建筑物的纠偏工序。</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GYROSCOPIC INSTRUMENTS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MEASURING</subject><subject>MEASURING DISTANCES, LEVELS OR BEARINGS</subject><subject>NAVIGATION</subject><subject>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</subject><subject>PHYSICS</subject><subject>SOIL SHIFTING</subject><subject>SURVEYING</subject><subject>TESTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBxKs3MScnMS1dISS3LTCzJzM9TKEpNLslMqwQJ5qaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0NzQwNzC2NTR2Ni1AAALU0nEw</recordid><startdate>20231124</startdate><enddate>20231124</enddate><creator>CHEN QIANRAN</creator><creator>TIAN PEIXIAN</creator><creator>ZHOU JINWEN</creator><creator>LIN QIHUI</creator><scope>EVB</scope></search><sort><creationdate>20231124</creationdate><title>Building deviation rectifying method</title><author>CHEN QIANRAN ; TIAN PEIXIAN ; ZHOU JINWEN ; LIN QIHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117107835A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GYROSCOPIC INSTRUMENTS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MEASURING</topic><topic>MEASURING DISTANCES, LEVELS OR BEARINGS</topic><topic>NAVIGATION</topic><topic>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</topic><topic>PHYSICS</topic><topic>SOIL SHIFTING</topic><topic>SURVEYING</topic><topic>TESTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN QIANRAN</creatorcontrib><creatorcontrib>TIAN PEIXIAN</creatorcontrib><creatorcontrib>ZHOU JINWEN</creatorcontrib><creatorcontrib>LIN QIHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN QIANRAN</au><au>TIAN PEIXIAN</au><au>ZHOU JINWEN</au><au>LIN QIHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Building deviation rectifying method</title><date>2023-11-24</date><risdate>2023</risdate><abstract>The invention relates to the technical field of building deviation rectification, in particular to a building deviation rectification method which comprises the following construction steps of excavation of a foundation pit, implantation of a reinforcing pile, installation of a monitoring system, implantation of a steel pipe set, flushing deviation rectification, installation of a reinforcement cage and first foundation maintenance. And the deviation rectifying procedure of the building can be simplified. 本申请涉及建筑物纠偏的技术领域,尤其是涉及一种建筑物纠偏方法,包括如下施工步骤:开挖基础坑、植入加固桩、安装监控系统、植入钢管组、冲水纠偏、加装钢筋笼、第一地基养护,可以减少纠偏过程中对建筑物原结构损伤情况,能够简化建筑物的纠偏工序。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117107835A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GYROSCOPIC INSTRUMENTS
HYDRAULIC ENGINEERING
MEASURING
MEASURING DISTANCES, LEVELS OR BEARINGS
NAVIGATION
PHOTOGRAMMETRY OR VIDEOGRAMMETRY
PHYSICS
SOIL SHIFTING
SURVEYING
TESTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Building deviation rectifying method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T00%3A41%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20QIANRAN&rft.date=2023-11-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117107835A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true