Building deviation rectifying method
The invention relates to the technical field of building deviation rectification, in particular to a building deviation rectification method which comprises the following construction steps of excavation of a foundation pit, implantation of a reinforcing pile, installation of a monitoring system, im...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of building deviation rectification, in particular to a building deviation rectification method which comprises the following construction steps of excavation of a foundation pit, implantation of a reinforcing pile, installation of a monitoring system, implantation of a steel pipe set, flushing deviation rectification, installation of a reinforcement cage and first foundation maintenance. And the deviation rectifying procedure of the building can be simplified.
本申请涉及建筑物纠偏的技术领域,尤其是涉及一种建筑物纠偏方法,包括如下施工步骤:开挖基础坑、植入加固桩、安装监控系统、植入钢管组、冲水纠偏、加装钢筋笼、第一地基养护,可以减少纠偏过程中对建筑物原结构损伤情况,能够简化建筑物的纠偏工序。 |
---|