Installation process of wind power overhaul equipment
The invention discloses an installation process of wind power maintenance equipment, and relates to the technical field of wind power equipment maintenance. The installation process is realized through the following steps: A, preparation before installation; b, a leveling base is installed; c, hoist...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an installation process of wind power maintenance equipment, and relates to the technical field of wind power equipment maintenance. The installation process is realized through the following steps: A, preparation before installation; b, a leveling base is installed; c, hoisting and rotating the cargo boom; d, pushing the telescopic tower body to turn over and stand upright; e, fixing the electromagnetic adsorption device; f, wiring and debugging; and G, ending and clearing the field. By means of the installation technology, rapid installation and disassembly of the special matched wind power overhaul equipment small in occupied area and low in use cost can be achieved, the operation height can be flexibly adjusted and lengthened, transportation and transfer of the wind power overhaul equipment are facilitated, and the working efficiency is improved. The device has the advantages of being convenient to install, convenient to transport, adjustable in height, convenient to operate, safe |
---|