Tower material management method
The invention relates to the technical field of tower material management, in particular to a tower material management method. The method comprises the following steps: S1, dividing a storage area; s2, numbering and sorting the storage areas; step S3, material distribution of the tower material; s4...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of tower material management, in particular to a tower material management method. The method comprises the following steps: S1, dividing a storage area; s2, numbering and sorting the storage areas; step S3, material distribution of the tower material; s4, the tower materials are counted; s5, numbering the tower materials; and S6, the tower materials are stored. Through the steps S1-S6, construction workers can efficiently and conveniently complete counting, reasonable material distribution and orderly stacking of the tower materials of each tower section, and then the construction efficiency is improved.
本发明涉及塔材管理技术领域,具体地说,涉及一种塔材物料管理方法。其包括如下步骤,步骤S1、存放区域划分;步骤S2、存放区域编号排序;步骤S3、塔材物料分料;步骤S4、塔材物料清点;步骤S5、塔材物料编号;步骤S6、塔材物料存放。通过上述步骤S1-S6,能够使得施工工人较为高效地、较为方便地完成对每一塔段的塔材物料进行清点统计、合理分料并进行有序堆放,进而提高施工效率。 |
---|