Extra-long single track railway tunnel vehicle scheduling method and scheduling system
The invention belongs to the technical field of tunnel construction, and particularly relates to an extra-long single track railway tunnel vehicle scheduling method and scheduling system. Comprising a main tunnel and a parallel adit parallel to the main tunnel, and further comprises avoiding transve...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention belongs to the technical field of tunnel construction, and particularly relates to an extra-long single track railway tunnel vehicle scheduling method and scheduling system. Comprising a main tunnel and a parallel adit parallel to the main tunnel, and further comprises avoiding transverse channels evenly arranged at intervals, and the avoiding transverse channels penetrate through the main tunnel and the parallel adit; the scheduling method comprises the steps that when the vehicle distance between a first vehicle and a second vehicle which run in opposite directions is smaller than or equal to a first preset distance, the first vehicle enters an avoiding transverse channel for avoiding, and the second vehicle passes; wherein the load of the first vehicle is lt; and load of the second vehicle. The invention provides an extra-long single track railway tunnel vehicle scheduling method and scheduling system, which can realize ordered transportation of extra-long single track railway tunnel vehicles |
---|