Construction method for underground facilities

The invention discloses a construction method for underground facilities. The construction method comprises the steps that positioning holes are formed in a rock stratum corresponding to a to-be-blasted area; a part of rock stratum is selected from the rock stratum abutting against the existing tunn...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHAO YUELONG, WAN CHAOHAI, ZHENG GUANGZHAN, YANG TONGQUN, LI JIAO, HE PINGCHUAN, LI ZHUANGGAO, YU MINGLIANG, LUO PENGCHENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for underground facilities. The construction method comprises the steps that positioning holes are formed in a rock stratum corresponding to a to-be-blasted area; a part of rock stratum is selected from the rock stratum abutting against the existing tunnel to form a rock protection layer, a vibration reduction hole set is formed in the rock protection layer, the rock protection layer is located between the rock stratum corresponding to the to-be-blasted area and the existing tunnel, and the vibration reduction hole set is provided with at least one vibration reduction hole; explosive, a water bag and stemming are loaded into the positioning holes; explosives are used for blasting the rock stratum corresponding to the to-be-blasted area, and vibration generated by the explosives is absorbed through the vibration reduction holes. Therefore, the rock protection layer is arranged between the rock stratum corresponding to the to-be-blasted area and the existing tunnel,