Method, device and equipment for calculating importance degree of substation node and medium

The invention discloses a transformer substation node importance degree calculation method, device and equipment and a medium. The method comprises the following steps: acquiring node information of a target node, and calculating a node weight of the target node based on the node information; acquir...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LU XIANFENG, LYU ZHIPENG, LIU HUANHUI, CHEN XIAOPENG, ZHUANG BOMING, XIE KAICHENG, HUANG SHUJIAN, LIU BIN, LAI YONG, LUO JUNJIE, SHI LICHENG, LIANG JINGTANG, YANG SHIHAO, LI HAOLIN, XIE YONGXIANG, ZHAI ZHANZHENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a transformer substation node importance degree calculation method, device and equipment and a medium. The method comprises the following steps: acquiring node information of a target node, and calculating a node weight of the target node based on the node information; acquiring line information of a node line matched with the target node, and calculating a line weight of the node line based on the line information; and based on the node weight and the line weight, calculating the node importance of the target node according to a preset algorithm. Through the technical scheme of the invention, the calculation of the importance of each node in the transformer substation can be realized, and then the importance sorting result of the transformer substation can be obtained according to the importance of each node so as to determine the node maintenance strategy, so that the pertinence and accuracy of the node importance calculation work are improved, and the calculation efficiency is impro