Rapid modeling method of BIM operation and maintenance model
The invention discloses a rapid modeling method for a BIM operation and maintenance model, and the method comprises the following steps: S1, receiving a BIM construction model, and carrying out the rechecking of the BIM construction model; s2, carrying out model lightweight processing on the BIM con...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a rapid modeling method for a BIM operation and maintenance model, and the method comprises the following steps: S1, receiving a BIM construction model, and carrying out the rechecking of the BIM construction model; s2, carrying out model lightweight processing on the BIM construction model; s3, performing incremental processing on the BIM construction model after lightweight processing according to operation and maintenance requirements; and S4, binding dynamic and static data and unique codes required by each component in the BIM construction model processed in the step S3 based on operation and maintenance information editor software to form a BIM operation and maintenance model consistent with the entity engineering. According to the method, the BIM construction model is modified through the preset rule, and the BIM operation and maintenance model consistent with an entity project is quickly formed by binding the dynamic and static data and the unique code required by the component |
---|