Temporary pier elevation determination method for girder few-fulcrum erection method

The invention discloses a temporary pier elevation determination method for a girder few-fulcrum erection method, which comprises the following steps of: sequentially numbering each temporary pier as Nj along the girder erection direction, j = {1, 2, 3...}; according to the linear relation between t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU JINZHU, HUANG GANLE, DONG JIAN, ZHENG JIANXIN, LI JIE, HUANG CAN, LIAO WANCHENG, ZHOU RENZHONG, HU QINXIA, XUE XIANKAI, LI YONGHUI, GAO HONGLEI, MU WENJUN, SUN NANCHANG, LYU XINRUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a temporary pier elevation determination method for a girder few-fulcrum erection method, which comprises the following steps of: sequentially numbering each temporary pier as Nj along the girder erection direction, j = {1, 2, 3...}; according to the linear relation between the deflection of the maximum cantilever state before the main beam is erected to the temporary pier Nj and the height of a pad needing to be arranged on the temporary pier Ni when the main beam is just erected on the temporary pier Nj, the total height delta hi of the pad of the temporary pier Ni when the main beam is just erected on the temporary pier Nj is calculated, and i = {1, 2, 3...} and ilt; j; and the delta hi and the beam bottom elevation f0 manufactured at the temporary piers Ni according to the line shape of the main beam are overlapped, and the elevation Hi of each temporary pier Ni when the temporary piers Nj are arranged on the main beam is obtained. According to the method, a reserved height empiric