Tunnel soft and hard interbedding tunneling control method and related equipment
The invention discloses a tunnel soft and hard interbedding tunneling control method and related equipment. The method comprises the following steps: acquiring geotechnical characteristic information of a target area corresponding to a to-be-tunneled tunnel; geological stratification estimation info...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a tunnel soft and hard interbedding tunneling control method and related equipment. The method comprises the following steps: acquiring geotechnical characteristic information of a target area corresponding to a to-be-tunneled tunnel; geological stratification estimation information of the target area is determined based on the geotechnical characteristic information, and the geological stratification estimation information comprises geological material physical attributes and a geological stratification thickness ratio; preset process parameters of the to-be-tunneled tunnel in the tunneling process are determined based on the geological stratification estimation information, and the preset process parameters comprise preset tunneling force and preset tunneling speed; the working state of the tunneling equipment is controlled based on the preset technological parameters, and the working state comprises tunneling force and tunneling speed.
本申请公开了一种隧道软硬互层掘进控制方法及相关设备。该方法包括:获取待掘进隧道对应目标区域的岩 |
---|