Construction method of subsection prefabricated underground diaphragm wall
The invention relates to the technical field of underground engineering, in particular to a construction method of a subsection prefabricated underground diaphragm wall, which comprises the following steps: constructing a guide wall of the underground diaphragm wall, excavating soil in a groove of t...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of underground engineering, in particular to a construction method of a subsection prefabricated underground diaphragm wall, which comprises the following steps: constructing a guide wall of the underground diaphragm wall, excavating soil in a groove of the underground diaphragm wall in a framing manner, backfilling mucky soil into the groove after the groove is formed, transporting the lower section prefabricated underground diaphragm wall to a groove opening, sinking to a designed elevation, and locking. The method comprises the steps that firstly, the upper-section prefabricated underground diaphragm wall is hoisted to the position above the lower-section prefabricated underground diaphragm wall, a connecting joint of the upper-section prefabricated underground diaphragm wall and the lower-section prefabricated underground diaphragm wall is constructed, finally, locking of the lower-section prefabricated underground diaphragm wall is relieved, a whole formed by |
---|