Bridge monitoring and evaluation method for tunnel construction underneath passing high-speed railway bridge

The invention discloses a bridge monitoring and evaluation method for a tunnel construction underneath passing high-speed rail bridge. The method comprises the following steps: S1, data acquisition: acquiring data of influence on the periphery of a tunnel needing to be constructed in a high-speed ra...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JIA XUJIN, HE KUN, LI XIAOQUAN, LIU PEIYU, QIU ZHIQIANG, WANG YAFEI, ZHAO XU, WU PEIPEI, DENG QIANG, JIA YUMEI, WANG YONGNING, DONG YUJIANG, GU XIXUE, ZHAO XUMIN, OUYANG HAIMAN, XIAO KUN, WU SHAO, WU ZHAOXIANG, ZHANG XUESONG, QING SI, CHENG JIDONG, LI LING, FU DONGLI, WANG WENHUI, WANG CHUNLEI, ZHANG XIONGWEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a bridge monitoring and evaluation method for a tunnel construction underneath passing high-speed rail bridge. The method comprises the following steps: S1, data acquisition: acquiring data of influence on the periphery of a tunnel needing to be constructed in a high-speed rail driving process; s2, risk evaluation: carrying out risk evaluation according to the collected data information; s3, tunnel construction is conducted, specifically, a tunnel is mined at the position with the low risk level evaluated through risk evaluation; s4, noise collection, wherein noise generated in the tunnel in the running process of the high-speed rail is collected; s5, risk judgment: processing and analyzing the collected noise information; and S6, evaluation management: performing unified management on the data. The noise in the tunnel in the running process of the high-speed rail can be effectively judged by collecting the noise, whether the noise can influence constructors or not is judged, the influ