Integral assembling and lifting construction method for cable-stayed hanging basket structure
The invention discloses an integral assembling and lifting construction method for a guy cable hanging basket structure, which comprises the following steps: firstly, erecting a bracket for pouring a 0 # block section and a 1 # block section of a main beam on the periphery of a tower column, and mea...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an integral assembling and lifting construction method for a guy cable hanging basket structure, which comprises the following steps: firstly, erecting a bracket for pouring a 0 # block section and a 1 # block section of a main beam on the periphery of a tower column, and meanwhile, erecting a guy cable hanging basket assembling platform on the ground; a 0 # block section and a 1 # block section of the main beam are poured, and meanwhile a guy cable hanging basket structure is assembled on the guy cable hanging basket assembling platform; lifting station mechanisms are installed on the 0 # block section and the 1 # block section, the lifting station mechanisms are overhung outside the 1 # block section, and the guy cable hanging basket structure is lifted upwards through the lifting station mechanisms; the supports at the bottoms of the 0 # block section and the 1 # block section are dismantled; the whole cable-stayed hanging basket structure slides towards the side of the tower column |
---|