Whole-width incremental launching construction method for steel structure bridge in narrow space
The invention provides a narrow space steel structure bridge whole-width incremental launching construction method which comprises the following steps that a web in a box girder is reinforced, and stay cables on the box girder are symmetrically dismantled from the two ends of the box girder to the c...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a narrow space steel structure bridge whole-width incremental launching construction method which comprises the following steps that a web in a box girder is reinforced, and stay cables on the box girder are symmetrically dismantled from the two ends of the box girder to the center of the box girder; the box girder cantilever arm, connected with the box girder, of the stay cable is gradually cut from the two ends to the center, and the cutting position is recorded; the box girder is jacked to a first preset height through the jacking device and the jacking distribution girder; pushing brackets and pushing devices are mounted on the existing abutments and the temporary abutments at the bottoms of the box girders, and the box girders are gradually pushed to the temporary abutments from the existing abutments in a segmented manner through the pushing devices; building construction is conducted on the bottom of the original box girder, and after construction is completed, reset pushing oper |
---|