Power tower auxiliary climbing device for improving distribution network repair scheduling efficiency
The invention relates to the technical field of power tower pole construction, in particular to a power tower pole auxiliary climbing device for improving distribution network first-aid repair dispatching efficiency, which comprises a tower pole body, a first track groove, at least two concave groov...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of power tower pole construction, in particular to a power tower pole auxiliary climbing device for improving distribution network first-aid repair dispatching efficiency, which comprises a tower pole body, a first track groove, at least two concave grooves and a mounting disc, a second rail groove is formed in the outer wall of one side of the mounting disc; the climbing unit comprises a bearing box body, two arc-shaped limiting plates, a sliding piece and a supporting piece, and fixing plates are arranged at one ends of the two arc-shaped limiting plates; the driving unit comprises a turbine assembly, a worm assembly, a first bevel gear, a first pedal piece, a second pedal piece and a manual piece, wherein the first pedal piece, the second pedal piece and the manual piece are connected with the first bevel gear. The labor-saving pulley assembly comprises a bearing plate, a fixed pulley, a movable pulley and a mooring rope, through the device, the problem that whe |
---|