Rapid construction method for special-shaped mid-partition wall of multi-arch tunnel
The invention provides a rapid construction method for a special-shaped middle partition wall of a multi-arch tunnel. The rapid construction method comprises the steps that firstly, a foundation is reinforced; 2, reinforcing steel bar binding is conducted, specifically, 1-2 sets of reinforcing steel...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a rapid construction method for a special-shaped middle partition wall of a multi-arch tunnel. The rapid construction method comprises the steps that firstly, a foundation is reinforced; 2, reinforcing steel bar binding is conducted, specifically, 1-2 sets of reinforcing steel bars are bound in advance before the foundation is reinforced in the step 1; thirdly, steel plates are prefabricated, and the multiple machining procedures are sequentially and circularly operated to drive the multi-arch tunnel special-shaped mid-partition wall to be rapidly formed; the multiple machining procedures comprise the fourth step of walking and positioning of the mid-partition trolley; a special-shaped formwork is arranged at the top of a mid-partition trolley formwork, and a corner formwork capable of sliding and rotating is arranged at the bottom of the mid-partition trolley formwork The arched connecting support is arranged at the front end of the top of the mid-partition trolley, so that an assembly |
---|