Offshore wind power pipe pile all-tide-level shipping method

The invention relates to an offshore wind power pipe pile all-tide-level boarding transferring method. The method comprises the specific steps that S1, boarding preparation is conducted; s2, positioning the transfer equipment; s3, the tubular pile slides on the land; s4, the pipe piles are boarded;...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU JUN, ZHANG LUNWEI, WU SHUAIYU, CHEN JIANPING, GUO CHUANZHOU, MI ZHINAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to an offshore wind power pipe pile all-tide-level boarding transferring method. The method comprises the specific steps that S1, boarding preparation is conducted; s2, positioning the transfer equipment; s3, the tubular pile slides on the land; s4, the pipe piles are boarded; s5, the pipe pile slides on the ship; and S6, the displacement equipment is dismantled. The method has the following advantages that the height difference between the barge and the wharf can be rapidly leveled by arranging the moving and transporting equipment, the height adjustment is not limited by the stroke of the jacking hydraulic cylinder, the pipe pile boarding is not limited by the damp level, meanwhile, boarding installation and disassembly are convenient, the all-weather operation time and efficiency are greatly improved, the safety risk is reduced, and the transportation period is shortened. 本发明涉及一种海上风电管桩全潮位上船移运方法,具体步骤包括:S1、上船准备;S2、定位移运设备;S3、管桩陆地滑移;S4、管桩上船;S5、管桩船上滑移;S6、移位设备拆除。本发明具有如下优点:通过设置移运设备能快速调平驳船与码头