Method for building underground subway station in road by using large nested jacking pipe

The invention discloses a method for constructing a buried subway station in a road by using a large nested jacking pipe. The method comprises the following steps: step S1, constructing open-cut working wells which are laterally arranged at two ends of a construction road as starting wells or receiv...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XU NINGFEI, LIU JIANMEI, ZHAI LIHUA, LI XIANSEN, DONG YANPING, YAN DONG, MEI JUN, LIANG YUEHUA, WANG DUJUAN, DING LIN, LV JIANYING, LIU ZHAOGANG, JIANG BAOCHEN, ZHOU CHAOTING, GUO QING, CUI TENG, YAO LIANG, XIAO PINGPING, WANG AIHUA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a method for constructing a buried subway station in a road by using a large nested jacking pipe. The method comprises the following steps: step S1, constructing open-cut working wells which are laterally arranged at two ends of a construction road as starting wells or receiving wells of the large-section jacking pipe; s2, pipe jacking equipment is erected in the open excavation working well, firstly, a large-section pipe jacking channel under the road is completed through jacking, and the large-section pipe jacking channel considers starting or receiving of a small-section jacking pipe, translation of a small-section jacking pipe joint and the space requirement for muck and material transportation; and S3, a small-section pipe jacking machine and small-section pipe jacking pipe joints are translated and transported in the large-section pipe jacking channel, small-section jacking pipes are launched or received in the large-section pipe jacking channel, the small-section jacking pipes a