Short-term and long-term connection retaining wall construction method
According to the short-term and long-term connection retaining wall construction method provided by the invention, by performing reservation design in the structure of the short-term retaining wall, excavation of a new foundation during long-term implementation can be avoided, so that traffic influe...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG JIAN SU YAHAN GE RUOYU GUO PENG HAN YAOXIANG SHEN XUEFANG XU ZHIHONG GAO XIN ZHU RONGJUN ZENG HUIFEN |
description | According to the short-term and long-term connection retaining wall construction method provided by the invention, by performing reservation design in the structure of the short-term retaining wall, excavation of a new foundation during long-term implementation can be avoided, so that traffic influence and potential safety hazards during long-term implementation are eliminated. The method comprises the steps that when a recent retaining wall is manufactured, a bottom foundation and part of a wall body of a long-term retaining wall are excavated and poured in advance and can be directly used during long-term widening, and the retaining wall foundation is prevented from being excavated again.
本发明提供了一种近远期衔接挡墙构造方法,其通过在近期挡墙的结构中进行预留设计,可避免远期实施时开挖新建基础,从而消除远期实施时的交通影响和安全隐患。其包括:在近期挡墙的制作时,提前开挖浇筑远期挡墙的底部基础及部分墙身,可供远期拼宽时直接使用,避免重新开挖挡墙基础。 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116517019A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116517019A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116517019A3</originalsourceid><addsrcrecordid>eNrjZHALzsgvKtEtSS3KVUjMS1HIyc9Lh_CS8_PyUpNLMvPzFIpSSxIz8zLz0hXKE3NyQDLFJUWlELnc1JKM_BQeBta0xJziVF4ozc2g6OYa4uyhm1qQH59aXJCYnJqXWhLv7GdoaGZqaG5gaOloTIwaAGKUNBU</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Short-term and long-term connection retaining wall construction method</title><source>esp@cenet</source><creator>WANG JIAN ; SU YAHAN ; GE RUOYU ; GUO PENG ; HAN YAOXIANG ; SHEN XUEFANG ; XU ZHIHONG ; GAO XIN ; ZHU RONGJUN ; ZENG HUIFEN</creator><creatorcontrib>WANG JIAN ; SU YAHAN ; GE RUOYU ; GUO PENG ; HAN YAOXIANG ; SHEN XUEFANG ; XU ZHIHONG ; GAO XIN ; ZHU RONGJUN ; ZENG HUIFEN</creatorcontrib><description>According to the short-term and long-term connection retaining wall construction method provided by the invention, by performing reservation design in the structure of the short-term retaining wall, excavation of a new foundation during long-term implementation can be avoided, so that traffic influence and potential safety hazards during long-term implementation are eliminated. The method comprises the steps that when a recent retaining wall is manufactured, a bottom foundation and part of a wall body of a long-term retaining wall are excavated and poured in advance and can be directly used during long-term widening, and the retaining wall foundation is prevented from being excavated again.
本发明提供了一种近远期衔接挡墙构造方法,其通过在近期挡墙的结构中进行预留设计,可避免远期实施时开挖新建基础,从而消除远期实施时的交通影响和安全隐患。其包括:在近期挡墙的制作时,提前开挖浇筑远期挡墙的底部基础及部分墙身,可供远期拼宽时直接使用,避免重新开挖挡墙基础。</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230801&DB=EPODOC&CC=CN&NR=116517019A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230801&DB=EPODOC&CC=CN&NR=116517019A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>SU YAHAN</creatorcontrib><creatorcontrib>GE RUOYU</creatorcontrib><creatorcontrib>GUO PENG</creatorcontrib><creatorcontrib>HAN YAOXIANG</creatorcontrib><creatorcontrib>SHEN XUEFANG</creatorcontrib><creatorcontrib>XU ZHIHONG</creatorcontrib><creatorcontrib>GAO XIN</creatorcontrib><creatorcontrib>ZHU RONGJUN</creatorcontrib><creatorcontrib>ZENG HUIFEN</creatorcontrib><title>Short-term and long-term connection retaining wall construction method</title><description>According to the short-term and long-term connection retaining wall construction method provided by the invention, by performing reservation design in the structure of the short-term retaining wall, excavation of a new foundation during long-term implementation can be avoided, so that traffic influence and potential safety hazards during long-term implementation are eliminated. The method comprises the steps that when a recent retaining wall is manufactured, a bottom foundation and part of a wall body of a long-term retaining wall are excavated and poured in advance and can be directly used during long-term widening, and the retaining wall foundation is prevented from being excavated again.
本发明提供了一种近远期衔接挡墙构造方法,其通过在近期挡墙的结构中进行预留设计,可避免远期实施时开挖新建基础,从而消除远期实施时的交通影响和安全隐患。其包括:在近期挡墙的制作时,提前开挖浇筑远期挡墙的底部基础及部分墙身,可供远期拼宽时直接使用,避免重新开挖挡墙基础。</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHALzsgvKtEtSS3KVUjMS1HIyc9Lh_CS8_PyUpNLMvPzFIpSSxIz8zLz0hXKE3NyQDLFJUWlELnc1JKM_BQeBta0xJziVF4ozc2g6OYa4uyhm1qQH59aXJCYnJqXWhLv7GdoaGZqaG5gaOloTIwaAGKUNBU</recordid><startdate>20230801</startdate><enddate>20230801</enddate><creator>WANG JIAN</creator><creator>SU YAHAN</creator><creator>GE RUOYU</creator><creator>GUO PENG</creator><creator>HAN YAOXIANG</creator><creator>SHEN XUEFANG</creator><creator>XU ZHIHONG</creator><creator>GAO XIN</creator><creator>ZHU RONGJUN</creator><creator>ZENG HUIFEN</creator><scope>EVB</scope></search><sort><creationdate>20230801</creationdate><title>Short-term and long-term connection retaining wall construction method</title><author>WANG JIAN ; SU YAHAN ; GE RUOYU ; GUO PENG ; HAN YAOXIANG ; SHEN XUEFANG ; XU ZHIHONG ; GAO XIN ; ZHU RONGJUN ; ZENG HUIFEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116517019A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>SU YAHAN</creatorcontrib><creatorcontrib>GE RUOYU</creatorcontrib><creatorcontrib>GUO PENG</creatorcontrib><creatorcontrib>HAN YAOXIANG</creatorcontrib><creatorcontrib>SHEN XUEFANG</creatorcontrib><creatorcontrib>XU ZHIHONG</creatorcontrib><creatorcontrib>GAO XIN</creatorcontrib><creatorcontrib>ZHU RONGJUN</creatorcontrib><creatorcontrib>ZENG HUIFEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG JIAN</au><au>SU YAHAN</au><au>GE RUOYU</au><au>GUO PENG</au><au>HAN YAOXIANG</au><au>SHEN XUEFANG</au><au>XU ZHIHONG</au><au>GAO XIN</au><au>ZHU RONGJUN</au><au>ZENG HUIFEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Short-term and long-term connection retaining wall construction method</title><date>2023-08-01</date><risdate>2023</risdate><abstract>According to the short-term and long-term connection retaining wall construction method provided by the invention, by performing reservation design in the structure of the short-term retaining wall, excavation of a new foundation during long-term implementation can be avoided, so that traffic influence and potential safety hazards during long-term implementation are eliminated. The method comprises the steps that when a recent retaining wall is manufactured, a bottom foundation and part of a wall body of a long-term retaining wall are excavated and poured in advance and can be directly used during long-term widening, and the retaining wall foundation is prevented from being excavated again.
本发明提供了一种近远期衔接挡墙构造方法,其通过在近期挡墙的结构中进行预留设计,可避免远期实施时开挖新建基础,从而消除远期实施时的交通影响和安全隐患。其包括:在近期挡墙的制作时,提前开挖浇筑远期挡墙的底部基础及部分墙身,可供远期拼宽时直接使用,避免重新开挖挡墙基础。</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116517019A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Short-term and long-term connection retaining wall construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T10%3A07%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20JIAN&rft.date=2023-08-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116517019A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |