Short-term and long-term connection retaining wall construction method
According to the short-term and long-term connection retaining wall construction method provided by the invention, by performing reservation design in the structure of the short-term retaining wall, excavation of a new foundation during long-term implementation can be avoided, so that traffic influe...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | According to the short-term and long-term connection retaining wall construction method provided by the invention, by performing reservation design in the structure of the short-term retaining wall, excavation of a new foundation during long-term implementation can be avoided, so that traffic influence and potential safety hazards during long-term implementation are eliminated. The method comprises the steps that when a recent retaining wall is manufactured, a bottom foundation and part of a wall body of a long-term retaining wall are excavated and poured in advance and can be directly used during long-term widening, and the retaining wall foundation is prevented from being excavated again.
本发明提供了一种近远期衔接挡墙构造方法,其通过在近期挡墙的结构中进行预留设计,可避免远期实施时开挖新建基础,从而消除远期实施时的交通影响和安全隐患。其包括:在近期挡墙的制作时,提前开挖浇筑远期挡墙的底部基础及部分墙身,可供远期拼宽时直接使用,避免重新开挖挡墙基础。 |
---|